Along the way · level 1

Between walks: windows and restore drills

When changes are allowed to happen, what the note that accompanies them carries, which five things are backed up, and what a restore drill has to reconcile before it counts as passed.

A change window is a decision about when

Changes to a live stage go into a named window. The reason is not caution for its own sake — it is that a reader who arrives halfway through a stage being replaced has no way of telling a half-finished page from a broken one, and will treat it as broken.

A change outside a window needs a written note naming what breaks if it waits until the next one; that note is kept with the change notes rather than in a message thread.

A window is a decision about when, and nothing here is a promise about how often, how quickly or how reliably anything happens. Those would be claims, and this company was incorporated on the 30th of August 2026 — it has no measured period to make them from.

The two windows

First Tuesday of the month, 07:00 to 09:00 UK time. The main window; everything planned goes here.

Third Tuesday, the same hours. For whatever slipped out of the first, and for nothing that was never written down.

What a change note carries

Stages touchedby name
As they appear on the wall, so the note and the wall can be read against each other.
before
Field-list changeseach one
Field added, field removed, shape changed — one line each, not a summary.
before
Address-trail changeseach one
With the redirect each one leaves behind, because that redirect is the only thing holding an old address up.
before
Rollback stepinstructions
Written as instructions somebody else could follow without asking a question.
before
Accessibility passeswhich, and against what
Which of the four were rerun, and against which version of the stage.
during
Two signaturesnot one
The person who made the change, and the person who read the note.
after

The rollback step is written before the change, never during. A rollback invented while something is broken is a rollback nobody has read, and the first thing it meets is the field-list change that has already been applied.

The backup set, and what is deliberately not in it

Five things kept, and the rest regenerated

  • Inthe directory table, the category tree, the address-trail, the append-only trail, the account roles.
  • Outthe search lookup, every rendered page, and every file that can be regenerated from the five above.

The lookup is out because it is a derivative. Restoring a stale lookup over a current directory recreates the exact disagreement a restore is meant to end; rebuilding it from the restored directory cannot.

The address trail is the irreplaceable one. Every address ever published is in it, and an address with no address-trail row is a dead link with nothing to point it anywhere.

The restore drill, and the trail it writes

A drill is booked into the second window of each quarter. The backup set is restored into an empty environment and the lookup is rebuilt from the restored directory rather than restored.

The pass test is reconciliation, not a successful import. The category tree, the address-trail and the trail are compared row for row against the source, and the drill passes only when all three reconcile.

The restore note is signed and filed with the change notes. It names the backup used, the date that backup was taken, who ran the drill, how long the window stayed open, and every row that did not reconcile.